Showing posts with label Parkes (Menai) P/L. Show all posts
Showing posts with label Parkes (Menai) P/L. Show all posts

Sunday, 18 September 2022

Millionaire property developer Gordon Merchant's latest Yamba DA thwarted and next NRPP meeting may be deferred again re Hometown Australia's multi-dwelling Yamba DA

 

Image: Google Earth



NOTICE OF PUBLIC MEETING CANCELLATION –NORTHERN REGIONAL PLANNING PANEL


The following meeting has been cancelled:


· Panel reference number PPSNTH‐31 – Clarence Valley – SUB2019/0030 ‐ 52‐54 Miles St, Yamba ‐310 Lot Staged Residential Subdivision and ancillary infrastructure works including drainage reserves and the creation of a residue lot


The meeting was to be held on:


Wednesday, 21 September 2022 at 4pm

By teleconference


The meeting has been cancelled because the applicant has withdrawn the development application….



BACKGROUND


Clarence Valley Independent, 14 September 2022:


The Development Application DA for the $32 million staged residential subdivision located at the yet to be formed Miles Street, which runs east off Carrs Drive, was lodged with Clarence Valley Council CVC on behalf of Kahuna No 1 Pty Ltd, owners of the 42.5-hectare site.


The 850 metres by 500 metre site fronts Carrs Drive, with the to be constructed Miles Street and St James Primary School to the north, and Golding Street to the east.


CVC’s assessment report prepared by town planner James Hamilton notes the Kahuna Yamba Gardens DA was on public exhibition twice, with eight submissions received in the first exhibition period and 79 submissions from the most recent period.


The Council received a total of 87 individual submissions, comprising 87 objections and no submissions in support of the proposed development,” Mr Hamilton’s report stated.


The submissions raised issues relating to urban design, flooding, stormwater, traffic, filling, environment, services, climate change and sea level rise, heritage and impacts on the town.”


The assessment on the DA by Mr Hamilton listed six factors, including two endangered species, for refusal.


These factors for refusal included that The Rural Fire Service could not support the development under Section 100B of the Rural Fires Act 1997, and the fact the site contains two listed endangered flora species being Rotala tripartita and Spider orchid.


Sufficient information has not been provided to enable a determination on how the proposed development will not likely have a serious and irreversible impact on these two species,” the assessment stated.


The DA was also found by council to be inconsistent with the General Residential, Flood Planning and Earthworks clauses of the Clarence Valley Local Environment Plan 2011.


The proposal is inconsistent with the aims of Clarence Valley Local Environmental Plan 2011 as it has not been satisfactorily demonstrated that the proposed development will enable the sustainable development of the site, adequately protect areas of high ecological value and maintain the character of Yamba township,” the assessment stated.


CVC’s assessment also found the DA was inconsistent with numerous parts of the Clarence Valley Residential Zones Development Control Plan 2011, including Floodplain Management Controls, Sustainable Water Controls and Urban Release Area Controls…..


Watch this space for the next development application Mr. Merchant lodges on this land.



Meanwhile over in the Parkes Menai- Hometown Australia camp.....


It appears that Hometown Australia Management Pty Ltd's est. $33.9 million development application DA2021/0558 for 138 dwellings, an exhibition home and community facilities at 8 Park Ave, Yamba, may be deferred yet again by the Northern Regional Planning Panel (NRPP) as the NSW Dept. of Planning and Environment has not yet submitted its review of the flooding and risk evacuation procedures supplied by Hometown at the request of NRPP.


This is a proposed development with an unhappy history. The original land clearing and landfill under a Parkes Developments DA resulted in the unapproved felling of a significant number of native trees in the adjoining dedicated Wattle Park.  


Further, although the original land fill on 8 Park Ave is estimated to have reached RL2.8AHD so that the site only has a 1% (1 in 100) chance in any given year of being surrounded by 2.08 to 2.51 metres of flood water, the stormwater flows from this approx. 6.65ha lot enter an inadequate on-site and extended drainage network


Resulting in situations like this for established homes now at a comparatively altered ground level approx. 2.8m lower than the very large Park Ave lot.

Extract from a submission to Clarence Valley Council,
28 October 2021 


Extract from a submission to Clarence Valley Council,
29 October 2021 - open ditch drain


Extract from "West Yamba Update", West Yamba Information,
21 June 2022 - before and after height of common boundary
with 8 Park Ave, Yamba


This is a situation which during prolonged/high rainfall events is likely to exacerbate the 2-5% chance of mixed stormwater-riverine water inundation in adjacent streets and across a number of residential properties. As occurred in the March 2022.