Showing posts with label Clarence River. Show all posts
Showing posts with label Clarence River. Show all posts

Monday 24 September 2018

When it comes to protecting Clarence Valley water resources "Castillo's credibility is wearing very thin indeed"


This is a basic map clearly showing a historic cluster of small abandoned mine sites in the vicinity of the Mann River, one of the principal tributaries of the Clarence River which is the largest coastal river in New South Wales. 

The old Cangai Mine site is now part of a Castillo Copper Limited exploration lease and its proximity to the Mann River is apparent.

As the crow flies the distance between this site and the Mann River is estimated to be less than 4 kms and Cangi Mine is also bounded on three sides by three creeks which feed into the Mann.




Following North Coast Voices posting Castillo Copper Limited's Jackadgery Project: has spinning the truth already begun? on 17 September 2018 one Clarence Valley resident sent me an email which pointed out a curious ommission in Castillo Copper Limited exploration licence application this mining company:

"However, under Section 19.4 beneath the heading: “Surface water sources”, is the following requirement:

“Provide details of the existing surface water sources in the area that are likely to be affected by the activity. Provide details of the nearest watercourse/s and the distance between the proposed disturbance area/s and the nearest watercourse/s”.

Castillo's Response

“The proposed activity area bounded by Bobward creek from the west and Smelter creek from the east. The distance from disturbance area to Bobward creek is 550 – 620m; the distance to Smelter creek is about 500m. The water for drilling if required will most likely will be taken from Bobward creek. Permission has been sought and granted by the landowner”.

No mention of the Mann or Clarence in the entire document.

Talk about "dodgy". Castillo's credibility is wearing very thin indeed,"

BACKGROUND

North Coast Voices, 17 September 2018, Castillo Copper Limited's Jackadgery Project: has spinning the truth already begun?

Sunday 23 September 2018

Yamba, the jewel in the crown of Clarence Valley tourism



The Daily Examiner, 18 September 2018, p.1:

The Clarence Valley is out-performing the whole state in tourism growth, according to Clarence Valley Council, with Yamba the jewel in the crown.

Director environment, planning and community Des Schroder said the Clarence Valley had recorded a 12.2 per cent growth, while NSW had only notched up a 5.7 per cent growth.

Tourism has become one of the Valley’s biggest employers with 6.8 per cent of people employed in the Valley working in tourism and hospitality according to Mr Schroder.

Council statistics show Yamba has become the fourth most visited town in the North Coast behind Byron Bay, Port Macquarie and Coffs Harbour, with more tourists than Ballina, Tweed Heads and Old Bar, Taree.

Mr Schroder said according to NSW tourism research Yamba statistics are merely 30 per cent of Byron Bay’s tourism numbers at the moment, but it might not be that way for long.

“Yamba is growing but it’s not Byron Bay yet from a tourism point of view, but it’s getting up there,” he said.

Mr Schroder added the population of Yamba is fairly stable, but still growing.

He said the influx of people visiting Yamba around Christmas is starting to become a constant stream of tourists all year round.

“The impact of the highway will make a big difference,” Mr Schroder said. “The highway will improve access for people coming to Yamba from the north and south.”

With 30 per cent of tourists visiting Yamba hailing from South-East Queensland he said the council is conscious the tourism in Yamba will continue to grow.

“All council can do is put the framework in place,” Mr Schroder said.

“We need to manage lifestyle for the locals while allowing for tourism growth which balances jobs. You need tourism to create jobs but you don’t want to be over run by tourists.”…….

Monday 17 September 2018

Castillo Copper Limited's Jackadgery Project: has spinning the truth already begun?


On 15 September 2018 The Daily Examiner reported that:

Concerns  about the health of the Mann and Clarence rivers have been raised by community members following explorations by Castillo Copper at Cangai, near the historic copper mine….

It’s the high grade of the finding that has some community members concerned, with the prospect of a mine opening in the area becoming more likely.

At a meeting attended by about 20 people, NSW Parliament Greens candidate for the Clarence Greg Clancy and John Edwards from the Clarence Valley Environment Centre explained their concerns with mining so close to the river.

After having trouble getting in contact with Castillo through its website, Mr Edwards took his inquiries about the exploration to the mining regulator.

“I got an email from their managing director … and he said they were just out there doing some investigation and it wasn’t very much to worry about,” he said.

But this has not eased his concerns about the future of the Clarence Valley’s rivers.

“It would be good to get out there and see what they are actually doing,” he said.

“They’ve been talking up their exploration finds to date … maybe that is to just get investors’ money, but it’s certainly in a bad position where the river is and where all this siltation and run-off and toxic crap that runs off when they mine copper, silver...

“It’s not going to be easy for them when they are at the top of a hill overlooking a river.”

Mr Clancy said the group would need to get more information so they could understand exactly how the ore would be mined.

“There is loss of vegetation and threatened species on the hill. This is going to be an open cut mine … and the water table may not be up there, but once they’ve got an open cut mine it will gather water and they have to use water in the process to get the minerals out.

“They will be creating their own artificial ponds and we would have to explore this further, but I know with (extracting) gold they use arsenic.

“There are a whole range of chemicals they could be using. Whatever projections they are supposed to use, they often don’t work.”

The group is planning to do more research and attempt to make contact with the company before they hold another meeting in one month’s time at the Grafton library.
[my yellow bolding]

Castillo Copper Limited (ASX:CCZ) is a West Australian base metal explorer listed on the stock exchange which has four subsidiaries:

Castillo Copper Chile Spa, Total Minerals Pty Ltd, Queensland Commodities Pty Ltd  and Total Iron Pty Ltd.

Castillo Copper Limited holds three mining exploration leases as part of its Jackadgery Project:

EL 8625 (1992) 17-Jul-2017 17-Jul-2020 35 UNITS About 43 km WNW of GRAFTON TOTAL MINERALS PTY LTD est. at 155 km2
EL 8635 (1992) 21-Aug-2017 21-Aug-2020 52 UNITS About 41 km WNW of GRAFTON TOTAL IRON PTY LTD
EL 8601 (1992)  21-Jun-2017 21-Jun 2020 51 UNITS About 38 km SE of DRAKE QUEENSLAND COMMODITIES PTY LTD.

Castillo Copper is not characterising its activities on these leases as "just doing some investigation".

In fact it is indicating to its shareholders and the stock exchange that the company has clear intentions to mine at the old Cangai Mine site before the end of the exploration on these leases:

* “Road to fast-track production taking shape”

* “Preliminary metallurgical test-work on samples from the two McDonough’s stockpiles, along the line of lode, has demonstrated the ore can be beneficiated materially….. Discussions continue with prospective off-take partners interested in processing ore as relevant information comes to hand …. Meanwhile, the geology team have approached the regulator for guidance on the optimal way forward to remove the stockpiles from site and capture the economic benefits”

“…they are an asset and could potentially generate early cashflow”

* “The clear options are third party processing locally or a direct shipping ore product once regulatory clearance is secured”.

 Castillo Copper Limited images

So who are the people behind Castillo Copper Limited?

Well, the board is composed of:

Peter Francis Meagher, company director since 2 February 2018, from East Freemantle, West Australia - position Chairman;

Peter Smith, on the board as but not officially listed as a director of Castillo Copper Limited - position Non-Executive Director; and

Alan David Stephen Armstrong, company director since 1 August 2017, from Canning Vale West Australia - position Executive Director.

Listed company director who is not included at https://www.castillocopper.com/board/ is:

Neil Armstrong Hutchinson. company director since 1 August 2017, from Double View, Western Australia - position previously reported to be Technical Executive Director at Castillo Copper Limited since August 1, 2017. by Bloomberg.

NOTE; All three listed company directors appear to be shareholders in this miming company.

Castillo Copper Limited's Top 20 shareholders as of 20 September 2017 were:
Castillo Copper Limited Annual Report 2016-17


Monday 20 August 2018

Clarence River Estuary communities need to remain both alert and alarmed as NSW Berejiklian Government seeks to expand exposure to international cruise ship industry


In July 2018 the NSW Berejiklian Coalition Government released the document “NSW Cruise Development Plan” to the delight of the international cruise ship industry.

This plan confirms that Berejiklian ministry - sitting in offices over 670kms south of the small towns of Yamba and Iluka on the banks of the Clarence River estuary - is still pursuing the idea that the Port of Yamba is a potential official cruise ship destination.

The state government also obviously expects that Clarence Valley local government will both accommodate the needs of the plan and contribute to the cost of meeting this aim if it is progressed.

To further the Berejiklian Government’s aim to make as many small ports or undeveloped harbours/inlets capable of use by cruise ships the NSW Cruise Development Plan states that:

A regulatory framework that fosters the competitiveness of ports, encourages the expansion of the tourism sector, minimises environmental impacts, protects the community, and supports jobs growth is required for the NSW cruise industry.
National regulatory barriers currently inhibit the cruise industry, including the small expedition and luxury cruise market’s, access to NSW coastal ports.

Differences in regulatory requirements between states also restricts the freedom of cruise liners to set national itineraries that take advantage of regional ports.
The NSW Government will continue to lead discussions with the other States, Territories and the Commonwealth on removing regulatory barriers that limit cruise ship growth potential.

Action: The NSW Government will investigate opportunities to remove regulatory barriers to entry for emerging cruise markets, including the expedition cruise market, and will seek an inter-jurisdictional policy position with other governments. [my yellow highlighting]

What the Liberal-Nationals government in faraway Sydney considers as “regulatory barriers” may not be what the people of the Lower Clarence River consider as impediments which should be removed.


They are in place for good reason and any weakening of these regulations has the potential to affect the environmental sustainability of an ancient, healthy and highly productive estuary system which is the largest in south-east Australia and, whose waters are covered by Yaegl Native Title.

Facts estuary communities may need to continually press upon a state government wrapped up as it is in a cosy relationship with the international cruise ship industry.

Friday 6 July 2018

A CERTAIN RMS ASPHALT BATCHING PLANT: Open Letter to NSW Premier & Liberal MP for Willoughby, Gladys Berejiklian, as well as Minister for Roads Maritime and Freight & Nationals MP for Oxley, Melinda Pavey


Dear Premier Berejiklian and Minister Pavey,

Communities in the Clarence River estuary are concerned about an aspect of the NSW Government's current Pacific Highway construction planning.

Below are some of those concerns expressed to local newspaper The Daily Examiner with regard to a Roads and Maritime Services (RMS) plan to install a temporary asphalt batching plant at Woombah on the Clarence River flood plain.

The build is scheduled to start this month and the plant will operate for the next two and a half years.

Please note the attitude – local residents are not amused at the high-handed way in which the NSW Government and RMS went about a cursory declaration of intent.

“What they’re not happy about is an asphalt batching plant being built right near their houses, using their only connecting road to the villages”

“We want the highway, and we want the asphalt plant to be somewhere, but we want it to be away from our communities where it won’t impact on our health and safety”

“The plant will add a reported 500 truck moments and 100 car movements per day at peak, or one every minute, and residents are concerned the additional traffic will create safety problems, and a bottleneck at their intersection, which they already describe as “tight” after it was temporarily re-routed. They also cite concerns over possible health affects the dust may cause for nearby residents.”

We have a resident as close as 450 metres from the plant who is suffering from lung cancer….Although Pacific Complete have been made aware of this, since they were first told they have failed to take action to acknowledge her.”

“We live within one kilometre of the plant and we found out two weeks ago by letterbox drop”

“We found out last Wednesday they didn’t tell anyone else. We’ve been around to other residents who are just outside the area and they had no idea the plant was coming at all.”

I also draw your attention to the content of emails coming out of Iluka:

Woombah is surrounded by World Heritage National Park. Within the waterways affected by run off from the proposed asphalt plant is the organic Solum Farm. Woombah Coffee will also be affected. Not to mention the multiple organic gardners who sell at the Yamba Markets and those who grow their own food.

The small community of Woombah and its neighbour Iluka are places that welcome tourists for the natural and clean beauty of the environment. An asphalt plant WILL threaten that. 

In addition, the Esk River at Woombah is fed by many of the creeks and waterways in the bushland where the asphalt plant is proposed. They will be adversely affected, which will flow into the Esk which will flow into the Clarence which will affect the fishing, oyster and prawn industries, on which many make their living. Not to mention the tourist industry that survives because our area offers a clean environment with unpolluted air and water.

This proposal is an outrage. Teven said NO. Woombah says NO as well.​”

“What about our kids on school buses with no seatbelts and the increase in traffic particularly trucks”

“Iluka Naturally, turn off at the asphalt plant, how ironic.”

For my own part I would add to these expressions of concern the fact that the 80ha, NPWS-managed Mororo Creek Nature Reserve is only est. 98 metres from the western end of the southern boundary of the proposed asphalt batching site. 

This protected land parcel is one of the reserves which form part of a forested corridor linking Bundjalung National Park to the east and the protected areas of the Richmond Range to the west. It lies within the boundaries of the Yaegl Local Aboriginal Land Council area, the Clarence Valley Local Government Area and the Northern Rivers Catchment Management Authority.

The Mororo Creek Reserve conserves areas of endangered swamp sclerophyll forest, coastal saltmarsh, subtropical coastal floodplain forest and swamp oak floodplain forest.

Most importantly, Mororo Creek and several of its tributaries which run through this reserve empty into the Clarence River Estuary less than est. 2km from the proposed asphalt batching site.

Now I have no idea why the NSW Government decided that a brief three-page information sheet and invitation to comment published online at http://www.rms.nsw.gov.au/documents/projects/northern-nsw/woolgoolga-to-ballina/w2b-woombah-batch-plant-notification-2018-06.pdf was to be the limit of its community consultation effort or why a similar document was sent at short notice to such a small number of Woombah residents.

I don’t pretend to understand why the information sheet contained just one small image of a section of a Pillar Valley temporary asphalt batching plant with no description of typical batching plant infrastructure and no Woombah site layout plan at all, much less one to scale.

There was not a hint in the information sheet of the range of known issues which can arise during site construction, plant operation and site rehabilitation.

Those residents who were originally invited to comment were supplied with less than rudimentary information on which to assess the desirability of a batching plant on the designated site.

Given that the proposed Woombah asphalt batching plant site is est. 2 to 2.5kms as the crow flies from Clarence River estuary waters which:

(1) are covered by Yaegl Native Title;

(2) at certain points are covered by international treaties, including JAMBA, CAMBA, ROKAMBA;

(3) contain the second largest area of seagrass (83 ha), the largest area of mangroves (765 ha) and the third largest area of saltmarsh (290ha) in the northern rivers region [Williams et al 2006 in Northern Rivers Regional Biodiversity Management Plan 2010];

(4) are part of the largest combined river-ocean fishery in NSW containing high fisheries value marine species; and

(5) are a vital component of regional tourism, 

perhaps Premier Berejiklian and Minister Pavey can answer two vital questions.

1. Is the Woombah asphalt batching plant site above the 100 year flood level for the lower Clarence Valley flood plain?

Because if it is not, then the NSW Government’s cavalier attitude to flood risk management would potentially see toxic waste from asphalt batching flow into the Clarence River estuary during a flood event – including solid waste and any organic solvents/hydrocarbons captured in holding ponds for the life of the plant – along with any nearby excavated plant/road construction materials. After all, extreme flood event height predictions for that general area are 3.5 to 4.5 mAHD.

2. Why on earth was a decision made to site the asphalt batching plant and access road at a point along the Pacific Highway where it would cause the maximum damage to Iluka’s clean, green destination image and vital tourism trade?

When the NSW Government first mooted the Pacific Highway upgrade on the North Coast one of the advantages it canvassed was an increase in tourism numbers due to better road conditions.


Most of these visitors holidayed along the Clarence Coast and Iluka is a strong component of that coastal tourism.

If the NSW Government seriously believes that leaving Woombah-Iluka with only one safe, unimpeded access point for day, weekend and long-stay visitors, the Yamba to Iluka foot passenger only ferry, will not significantly affect tourism numbers over the course of two and a half years, one has to wonder if it bothered to investigate the issue at all before signing off on the proposed plant site.

The effect of siting the asphalt batching plant and access road on the designated site will in all likelihood have the effect of diminishing not growing tourism traffic to Iluka for a period beyond the years it actually takes to complete the Maclean to Devil’s Pulpit section of the highway upgrade, as visitor perception of a holiday area can change when industrial level activity becomes visually prominent.

When it comes to commitment to the community consultation process, the NSW Government obviously hasn’t insisted that Roads and Maritime Services live up to its undertaking to engage with communities to understand their needs and consider these when making decisions.

In fact, looking at satellite images of the site one cannot escape the suspicion that pre-construction ground preparation had already commenced before any information was sent out to selected Woombah residents.

Since news of the asphalt batching plan site reached the Lower Clarence and residents began to approach their local state member, there appears to have been a promise made to hold a "drop-in information session" at an unspecified date.

Having experienced NSW departmental drop-in information sessions, I am well aware that they are of limited value as purveyors of anything other that the meagre degree of information found in the aforementioned three page RMS document and, ineffectual as vehicles for genuine community consultation.

The people of Woombah and Iluka deserve better.  They deserve a formal information night which canvasses all the issues, with representatives from RMS and the Pacific Highway project team prepared to address concerns and answer questions, as well as representatives of both the Premier and Minister for Roads, Maritime and Freight in attendance as observers.

I’m sure that all residents and business owners in both Woombah and Iluka would appreciate both Premier and Minster taking the time to consider these questions and ensure government genuinely consults with both village communities before considering proceeding with any Roads and Maritime Servces site proposal.

Sincerely,


Clarence  Girl

Monday 2 July 2018

Yet another 'temporary' asphalt batching plant rears its ugly head - this time at Woombah in the Clarence Valley


It would appear that the Berejiklian Government is about to wish a temporary asphalt batching plant on the Lower Clarence River flood plain.

Running for two and a half years day and night.

Two years of bitumen odour from the holding tanks, lime dust from the silo, diesel fumes from the generator, sulphur oxides and nitrogen oxides releasing during productionall wafting on the breeze - along with the never ending rumble of dusty heavy trucks belching exhaust fumes.

Then a cleanup of the toxic waste left behind.

With not even the courtesy of a genuine community consultation.


Australian and NSW Government-RMS, June 2018:

The Australian and NSW governments are jointly funding the Woolgoolga to Ballina Pacific Highway upgrade. Roads and Maritime Services’ Pacific Highway Project Office, Pacific Complete and its contractor partners are working together to deliver the upgrade.

To build the upgrade, the project team will be establishing batch plants along the 155 kilometre route. These sites will have different functions and will support the building of the new road.

The project team is proposing to build a temporary asphalt batch plant at Woombah. The batch plant would be located on the eastern side of the existing highway about 700 metres north of the old Iluka Road turnoff. A map has been provided to show the proposed location of the temporary asphalt batch plant.

This facility would make asphalt for the upgrade between Maclean and Devils Pulpit. Batch plants are facilities where raw materials are brought in, mixed together and then loaded into trucks and transported to site for use.

If approved, we would start building this site in July, with the batch plant operational by mid-August 2018. This site is proposed to be operational for about two and a half years with the land to be rehabilitated after completion in line with the project’s conditions of approval…..

There would be up to 500 heavy vehicle movements and 100 light vehicle movements per day at peak…..

Typically work would be carried out during the project’s approved construction hours which are:
9am -  6pm Monday – Friday
8am – 5pm Saturday

In areas where residents live more than 200 metres from the work area, extended work hours are allowed between 6am and 7am and 6pm and 7pm from Monday to Friday. Additionally, work outside or normal construction hours is also allowed where the impact to residents is predicted to be low, including no greater increase in noise levels than 5 decibels above the existing background noise level. 

The batch plant would need to be operational whenever asphalting work is required on the road. To minimise the impact on the Pacific Highway and ensure the work sites are safe, some of this work would be carried out at night. The temporary batch plant would need to operate at night to support these activities. Residents would be notified in advance of this taking place.

We are seeking your feedback on the proposed building and operation of the temporary asphalt batch plant at Woombah. To have your say, please fill out the attached feedback form by Wednesday 4 July 2018.

You can return it by:


Alternatively, you can provide your feedback over the phone by calling 1800 778 900 (toll free).

Google Earth snapshot of Woombah site and surrounding land, an est. 2.5kms as the crow flies from the Clarence River estuary and est. 1km from residential dwellings.


Woombah batching site boundaries.


The Daily Examiner, Letter to the Editor, 29 June 2018, p. 9:

Iluka Road problems
THE safety of Iluka road users is being put at risk by increasing truck movements to an additional 500 truck and trailers as well as 100 cars per day. That’s an additional truck or car travelling on Iluka road at a rate of one every 50 seconds! A situation that will continue for two and a half years.
The NSW Government has put out a letter seeking feedback on a proposed asphalt batch plant at Woombah for the Pacific Highway Upgrade from Mororo to Devils Pulpit.
However speaking with other locals in the Woombah area I found out quickly that very few residents of Woombah, let alone IIluka have received this letter. It is something that will affect all the 2500 residents of Iluka/Woombah area, as well as tourists and service vehicles. The letter has only just been sent out, but the site is already being prepared. Another case of community consultation and feedback after the fact, and the decision has been made!
The new temporary turn off from Iluka Rd onto the highway is already a difficult and dangerous turn-off because of the short turning lanes, additional turns and give way signs. Along with increased truck movements and road blockages associated with the construction of the Iluka road overpass, the dangers associated with navigating this entrance and exit to Iluka Road has increased.
Now all the traffic for an asphalt batching plant is to also travel on Garretts Lane, coming from the Old Pacific Highway and crossing Iluka Rd onto this new temporary turn-off.
This will cause traffic congestion problems for all Iluka Rd users. It will create further problems entering and exiting the highway. It will increase that danger of motor vehicle collisions and possible injury. We must stand up for the safety of our loved ones, our children, and for the many families who holiday here.
Locating the batching plant where it has its own dedicated access road to the highway, one which could adequately accommodate this large number of truck movements is the only sufficient solution. They should not be placed on busy local roads.
There are several areas, including Mororo Rd, which have already been blocked to public access, which could easily be fitted out for this purpose without endangering people.
Also with the plant being on the Western side of the Pacific Highway, these fully loaded trucks that are all going north will not have to cross the busy Pacific Highway but instead only need to merge with traffic. This would also solve the problem
Davild Wilson, Iluka

Monday 28 May 2018

Noble Caledonia Limited changes its mind about Port of Yamba-Clarence River?



noble-caledonia.co.uk, 27 May 2017

Noble Caledonia Limited’s “Australian Coastal Odyssey” twenty-two day cruise from 9-31 October 2018 - flying from London to Cairns to Port Moresby, then sailing through the Torres Strait and down the east coast of Australia to berth in Melbourne before returning home on 31 October - is still being advertised online and it just got a lot cheaper.

In an apparent effort to fill cabins aboard the vessel MV Caledonian Sky, the UK-based cruise line is now offering across-the-board discounts of £1,000 per two-person cabin.

There has also been a change in the ship’s itinerary for Day 16 - 24 October this year.

All mention of entry into Port of Yamba-Clarence River was removed from the cruise line's website sometime between 21 and 27 May and, Trial Bay, South West Rocks inserted instead for both its October 2018 “Australian Coastal Odyssey” and October 2019 “Australian Coastal Discovery” east coast cruises.
Caledonian Sky has already booked port berths/moorings in Queensland and Victoria as well as for two of the six official ports along the NSW leg of the 2018 cruise – Port of Newcastle (7am 25 October) and Port of Eden (7am 27 October). There is no published booking for Port of Yamba which requires piloted entry for sea-going ships.

Which has set Lower Clarence residents to wondering about the reasons for this welcome change of plan.

Some think it may be a public relations feint by Noble Caledonia to dampen expression of local concerns and it may yet decide to slip into the Clarence River estuary on or about 24 October this year.

Others point to the level of risk always associated with bringing ships like the 5-deck high, 91 metre long, est. 4,200 gross tonne Caledonian Sky across the entrance bar while avoiding collision with the culturally important Native Title reef “Dirrangun” and, the possibility that the cruise line’s insurance company might not be impressed if that risk were to be realised and it was faced with a second reef maritime incident in less than nineteen months involving the same ship.

Given the protracted negotiations between Noble Caledonia, its insurer and the Indonesian Government over a reported £350 million ‘fine’ incurred when the Caledonian Sky damaged over 18,000 sq. metres of pristine coral reef in the Raja Ampat island chain in March 2017, it is understandable that Noble Caledonia Limited may have reassessed the original “Australian Coastal Odyssey” itinerary and decided it preferred a less problematic short-stay mooring for Day 16.

Saturday 26 May 2018

Tweets of the Week



Note: Cr Keith Williams is deputy mayor of Ballina Shire Council on the NSW Far North Coast.


Friday 25 May 2018

Patagonia Australia held a "Never Town" conservation activism event at Yamba in May 2018


On Friday 18 May 2018 Patagonia Australia held a “Never Town” film showing and information night on environmental and conservation issues affecting the Clarence Coast.

NEVER TOWN TRAILER from Patagonia Australia on Vimeo.

The evening started with live music and a slide show against the sides of the water tower on Pilot Hill overlooking the Clarence River mouth and ocean at Yamba.

The good-sized crowd that gathered reflected the make-up of the Lower Clarence - retirees, young adults, families with children, along with local business owners and surfing enthusiasts. At least one Clarence Valley councillor was there.

Welcome to country was given by “Fox” Laurie accompanied by DJ Eamens on the didgeridoo.

Judith Melville spoke on some of the issues surrounding the state government’s proposal to designate Port of Yamba-Clarence River an official cruise ship destination and possibly build an international cruise ship terminal.

Dianne Chapman from the Yaegl Traditional Owners Aboriginal Corporation spoke of the Yaegl community’s connection to country and commitment to protect Clarence Valley land and waters.

After the film ended a Valley Watch Inc. petition was sent round the audience with this wording:

“We, the undersigned, respectfully call on the Premier of NSW, Gladys Berejiklian, Minister Melinda Pavey (Roads, Maritime and Freight) and Minister Andrew Constance (Transport and Infrastructure) to reject any proposals to allow cruise ships to enter the Port of Yamba or Clarence River estuary.

The Clarence River estuary is an integral part of a valuable Clarence Valley tourism sector which contributes over $300 million to the Clarence Valley’s annual income and employs more than 2000 people. To put that at risk for the dubious benefit to be derived from a brief morning visit is unacceptable, given the threats that a 4,000 tonne, 90 metre long cruise ship pose to the estuary, the fishing industry and Yamba/Iluka’s reputation as a clean, green holiday destination, and to the Dirrangun Reef, which is protected under the Native Title Act (1993).”

Anyone wishing to sign this petition can call in at the Valley Watch booth at Yamba River Markets held on the fourth Sunday of every month at Ford Park next to the ferry jetty. 

The next three market days are Sunday 27 May, 24 June and 22 July 2018.